Fully Integrated Solution

  • Design & Engineering
  • Fabrication
  • Installation
  • Project Management

Learn how we'll support your project at every step.

Let's Talk about your project Watch our video

North America's Leading Provider of Helical Piles

Innovation

Redefining the capibilities and applications of helical piles in industry.

Experience

The largest and most experienced helical pile provider in North America.

Leadership

Founding member of IHPEng professional associate and rich history of research and development.

Case Study
| Bridge Retrofit

Fox Creek, AB

Situation: 

How do you get a 100-ton load across a bridge with a 20-ton capacity? That was the question faced by one of Almita’s energy sector clients. The client needed to transport a 100-ton compressor across a small private bridge that was only designed to carry 20-tonnes and their timelines were tight. Presented with a thorny problem, the client contacted Almita Piling. Several factors combined to make the project a challenging one. First, the bridge deck was 15 feet above a frozen creek bed so it went without saying the project required an unusually long pile. Next, there was no geotechnical data available on the soil under the creek bed, so the pile designers would need to make a number of assumptions. The greatest challenge of all however, was time. The client asked that the bridge be reinforced and ready for use by 2:00 p.m. on Saturday of that week. It was already Wednesday afternoon but the Almita team is not used to walking away from a challenge. Almita agreed to take on the project and immediately set to work.

Solution: 

Almita’s custom-engineered solution was rolled out on two levels. In collaboration with the client’s engineers, Almita’s engineering team determined that the bridge could in fact handle the 100-ton load if it was sufficiently reinforced in the center of the span. Working with the assumption that the soil bed was composed of stiff clay, Almita’s engineering team then used its proprietary software to develop a set of piles and provided the stamped designs to the client for approval. The moment the design was approved, Almita’s shipping and receiving department immediately sourced and purchased the necessary building materials. By this point it was already Thursday. On Friday afternoon the pipe material was delivered to Almita’s Ponoka-based manufacturing facility and fabrication began. While the fabrication team built the piles, an installation team was dispatched to Fox Creek to assess the installation area. The moment the forty-foot long piles were finished they were inspected by Almita’s quality assurance team. Upon passing inspection by the quality assurance team, the piles were loaded on a truck and began their five-hour long journey to Fox Creek.

Results: 

By noon on Saturday morning the piles had been installed on either side of the bridge to a depth of 27 feet. Racing against the clock, Almita’s installation team capped the piles, installed a cross beam and welded the beam into place. By 2:30 p.m. all 100 tons of the load had crossed the bridge and were safely parked on the other side of the river. All totaled, the entire project went from initial client contact and needs assessment to design, fabrication, and installation in less than 72 hours and without compromising safety or quality. Without its skilled team of in-house engineers and a dedicated fabrication facility, there is no way that Almita could have met this demanding deadline. Although the piles had initially been intended as a temporary fixture, the client was so pleased with the result that they decided to leave them in as a permanent upgrade to the bridge.

Committed to Innovation

Custom Installation Equipment

Almita’s diverse fleet of custom installation equipment allows access to areas with difficult terrain, including those with soft soils and steep grades where conventional driving equipment or concrete pile rigs cannot be used.

University Partners

We have more partnerships with more universities than any other helical pile producer in North America.

IHPENG

Almita Piling is a founding member of the Institute of Helical Pile Engineering, along with Screwfast Foundations Ltd in the UK, Piletech Ltd from New Zealand, and Eazat in Japan, and continues to lead the industry in helical pile innovation.

Leadership & Innovation

Since 1991 Almita has adapted product and service offerings to market demands and industry conditions to provide unique and specific engineering solutions for foundation needs.

“Let's discuss how our experience will keep your project on solid footing.”

Let's talk about your project

Safety is Paramount

Health and safety forms the backbone of Almita’s vision statement and we employ full-time in-house resources dedicated to ensuring our health, safety and environment standards are maintained.

  • Almita Alberta Construction Safety Association
  • Almita canqual network
  • almita complyworks
  • Almita isnetworld member contractor

Run your own installation business? Let's work together.

Become an External Installer

We're always looking for intelligent, hard-working people.

Join our team