Commercial & Institutional Structures

Industry Applications

Portable and Permanent Industrial Work Camps

Commercial Structures

Street Light Bases

Grade Beam and Slab Foundations

Slope Stabilization

Overcome your project's obstacles

Industry Specific Challenge
Short Deadlines

Fast, Acurate Analysis
Almita's engineers typically turn a project from needs assessment to stamped design in mere days.

High Speed Production
Advanced semi-automated manufacturing equipment enables rapid production of high volumes of piles.

Rapid Installation
Unlike traditional methods, helical piles do not require pre-excavation or curing time. This dramatically reduces overall installation time.

Budgetary Constraints

Cost-effective Product
Along with Almita’s LEAN manufacturing process, Almita’s distributed products have been subject to rigorous testing to ensure product usability and satisfaction across all applications. Our team of Engineers will ensure a custom designed solution that results in the most efficient design possible for your project.

Co-existing with Neighbours in Urban Construction

Minimal Disturbance
Installing Almita Helical piles is completed with compact tracked equipment thereby minimizing the environmental footprint.  Our installation process and equipment results in minimal noise, and limited vibrations.  No angry neighbours and no damage to adjacent foundations or structures!

Case Study
| River Valley Funicular

Graham Construction/City of Edmonton, Edmonton, AB

Situation: 

Graham was tasked with constructing a funicular for the City of Edmonton in its iconic urban river valley. The project was originally designed for an alternate foundation system, but the river valley’s steep and environmentally sensitive terrain required the adaptability of a helical pile foundation. The project’s location was adjacent to a luxury hotel in the city’s downtown core, which meant our operation had to be quick and quiet to not disturb the hotel’s guests and residents in the area, all while staying within the client’s timeline and budget constraints.

Solution: 

The Almita engineering team worked closely with Graham and their project engineers, designers, and geotechnical consultants to design the river valley funicular’s foundation system. Typically large amounts of concrete are used for these systems, however large excavation was not an option for this project due to its difficult location. Excavation and site preparation was kept to a minimum to ensure that the river bank was minimally disturbed and that much of the natural vegetation was not removed. Helical pile installation equipment kept noise and vibration to low levels so that hotel guests and staff at the Hotel McDonald were not disturbed during the pile installation process. A strong safety plan was established to allow the crew and equipment to work on the extremely steep slope.

Results: 

A system of helical piles with a concrete cap was designed to tie into the river bank, which consisted of 250 piles. Although changing geotechnical conditions were encountered over the various installation areas, Almita engineers were able to modify the design, and pile adjustments were made right on site to ensure the schedule and budget goals were met. Almita received very favorable feedback from both Graham and the City of Edmonton for our work on this project.

“We'll save your time, your money and your project.”

Let's talk about your project